Real-world results from Ebflow electron beam welding projects, from small modular reactor pressure vessels to offshore wind turbine monopiles.
Ebflow cut the time to weld a small modular reactor pressure vessel demonstrator from over a year to less than 24 hours, a 99% reduction.
The first-ever electron beam welded wind turbine monopile foundation for Dogger Bank Wind Farm, welded 25 times faster and with 97% less CO2 emissions.